Interior inspection focus
- Doors, windows, glass, seals, locks and hardware
- Walls, ceilings, plaster, paint and flooring
- Tiles, marble, cabinetry and false ceilings
- Operable plumbing, electrical and communication fittings and included appliances
Post-renovation inspection
Plan a post-renovation inspection in Yau Tsim Mong District: timing, preparation, accessible scope and limitations, with 133 residential and commercial directory entries in Yau Tsim Mong.
Post-renovation inspection
Inspection types
Scope
Inspection covers visible, accessible areas inside the unit. Concealed finishes and disconnected or unauthorised equipment are noted as limitations; general unit inspection does not replace structural assessments or statutory certification.
The water-jet test requires permission and costs an additional HK$200. Confirm arrangements when booking.
Arrangements
Stairs cost an additional HK$80 per floor. Confirm any remote-area fee for the actual address when booking.
Residential and commercial units use HK$4.5 per sq ft of usable area, subject to area-tier minimum charges; stair and remote-area fees apply separately.
PricingInspections run daily 09:00–18:00. Same-day slots may be possible depending on availability; the date is fixed only once the booking is confirmed.
ProcessAn electronic report without photos is normally issued on the next business day.
Report content and useLocal preparation
For Tsim Sha Tsui malls, offices or homes, confirm the correct registration point and tenant unit. Commercial renovation checks cover agreed works and unit fittings, not licensing or fire-safety approval.
For Jordan buildings sharing a name, use the street number and explain stair access. For occupied second-hand units, arrange permission and access to operable equipment before the visit.
For Yau Ma Tei, state the lift-served floor and any remaining stairs. Explain older finishes, cabinet-covered and inaccessible areas so the report distinguishes checked items, limitations and follow-up.
For Mong Kok mixed-use buildings, give use, floor and entrance rather than only a mall name. For shop handovers, bring the equipment list and separate tenant fittings from shared equipment.
For Tai Kok Tsui, verify the estate phase or standalone building’s street number. State whether inspection is before renovation or after completion: the checklist and follow-up party differ.
Inspection and follow-up
Prepare the quotation, drawings, equipment models and agreed changes.
After receiving the electronic report without photos, organise findings by location and item number and request an itemised response from the developer, owner or contractor. Your own photos can support your follow-up records.
Confirm repair progress and site conditions before checking the same locations. For a separately booked reinspection, send the recheck list and agree scope, availability and the separate fee first.
Neighbourhoods
Kowloon includes many walk-ups and commercial buildings. Confirm access hours, goods-lift use and visitor registration with management or the owner in advance.
District directory
133 directory entries: 100 residential, 33 commercial. Search by Chinese or English name, address or district. For an unlisted unit, send the address directly.
Showing 133 of 133 entries
FAQ
Provide the complete building, phase/block, floor and unit, usable floor area and preferred date. Explain the handover or renovation stage, utilities and access permission.
Explain completed and ongoing work first so timing and scope can be agreed. Disconnected equipment, uncured work and covered finishes may not be testable. Arrange basic cleaning and utilities and distinguish unfinished work from workmanship issues.
Use report locations and item numbers to prepare a follow-up list and request an itemised response and repair schedule. Keep agreed scope changes and responses, then recheck the same locations after repair. A separately booked reinspection is chargeable.
The fee uses HK$4.5 per sq ft of usable floor area with area-tier minimum charges. Stairs cost HK$80 per floor; applicable location and optional water-jet test fees are separate. Send the full address to confirm the total quote.
The electronic report is normally issued on the next business day. It records issue locations and inspection results without photos. Owners follow up rectification with the developer or contractor; a separately booked reinspection is chargeable.