Interior inspection focus
- Doors, windows, glass, seals, locks and hardware
- Walls, ceilings, plaster, paint and flooring
- Tiles, marble, cabinetry and false ceilings
- Operable plumbing, electrical and communication fittings and included appliances
New Territories · Sai Kung
Choose a new-home, second-hand, older-building or post-renovation inspection in Sai Kung District. Browse 82 directory entries in Sai Kung and check preparation, pricing and report arrangements.
6
Areas
82
Listings
4
Types
Inspection types
Scope
Inspection covers visible, accessible areas inside the unit. Concealed finishes and disconnected or unauthorised equipment are noted as limitations; general unit inspection does not replace structural assessments or statutory certification.
The water-jet test requires permission and costs an additional HK$200. Confirm arrangements when booking.
Arrangements
Stairs cost an additional HK$80 per floor. Confirm any remote-area fee for the actual address when booking.
Residential and commercial units use HK$4.5 per sq ft of usable area, subject to area-tier minimum charges; stair and remote-area fees apply separately.
PricingInspections run daily 09:00–18:00. Same-day slots may be possible depending on availability; the date is fixed only once the booking is confirmed.
ProcessAn electronic report without photos is normally issued on the next business day.
Report content and useLocal preparation
For Sai Kung village houses, houses or estates, provide village and street number or block, floors, stairs and entrance. Confirm roof, garden and external access separately rather than assuming all areas are available.
For Tseung Kwan O, give formal estate, phase and block rather than only a station. Check the relevant phase’s handover specifications or bring equipment and works records for second-hand or renovated units.
For Hang Hau estates, provide the actual building and entrance and explain occupancy. Check retained fittings at vacant possession; for renovation inspections, confirm completion and appropriate removal of protection.
For Tiu Keng Leng, give building, block and residential entrance and explain any podium or lift changes. Utilities and operable equipment must be available for testing on the inspection date.
For LOHAS Park, specify phase, formal development name and block. Handover specifications, included equipment and defect submission must be checked for the relevant phase, not borrowed from another development.
For Clear Water Bay homes, explain the full street number, internal storeys and entrance. Confirm roof, garden or external-area permissions, safety and scope for village houses or houses and give usable area.
Neighbourhoods
Some New Territories locations, such as Ma Wan, carry a remote-area fee. Give the full address when booking so the fee can be confirmed.
District directory
82 directory entries: 82 residential, 0 commercial. Search by Chinese or English name, address or district. For an unlisted unit, send the address directly.
Showing 82 of 82 entries
FAQ
Provide the complete building, phase/block, floor and unit, usable floor area and preferred date. Explain the handover or renovation stage, utilities and access permission.
Choose by the unit’s actual stage: new handover, second-hand possession, existing finishes or completed renovation. The Sai Kung directory lists 82 residential and 0 commercial entries. Find the unit by use and address, then confirm equipment, access and utilities.
Yes. Send the full address, unit use, usable area, preferred date and current condition. Neighbourhood lists use address text; an absent listing does not mean service is unavailable, and you need not select another property name to enquire.
The fee uses HK$4.5 per sq ft of usable floor area with area-tier minimum charges. Stairs cost HK$80 per floor; applicable location and optional water-jet test fees are separate. Send the full address to confirm the total quote.
The electronic report is normally issued on the next business day. It records issue locations and inspection results without photos. Owners follow up rectification with the developer or contractor; a separately booked reinspection is chargeable.