Interior inspection focus
- Doors, windows, glass, seals, locks and hardware
- Walls, ceilings, plaster, paint and flooring
- Tiles, marble, cabinetry and false ceilings
- Operable plumbing, electrical and communication fittings and included appliances
Post-renovation inspection
Plan a post-renovation inspection in Sai Kung District: timing, preparation, accessible scope and limitations, with 82 residential and commercial directory entries in Sai Kung.
Post-renovation inspection
Inspection types
Scope
Inspection covers visible, accessible areas inside the unit. Concealed finishes and disconnected or unauthorised equipment are noted as limitations; general unit inspection does not replace structural assessments or statutory certification.
The water-jet test requires permission and costs an additional HK$200. Confirm arrangements when booking.
Arrangements
Stairs cost an additional HK$80 per floor. Confirm any remote-area fee for the actual address when booking.
Residential and commercial units use HK$4.5 per sq ft of usable area, subject to area-tier minimum charges; stair and remote-area fees apply separately.
PricingInspections run daily 09:00–18:00. Same-day slots may be possible depending on availability; the date is fixed only once the booking is confirmed.
ProcessAn electronic report without photos is normally issued on the next business day.
Report content and useLocal preparation
For Sai Kung village houses, houses or estates, provide village and street number or block, floors, stairs and entrance. Confirm roof, garden and external access separately rather than assuming all areas are available.
For Tseung Kwan O, give formal estate, phase and block rather than only a station. Check the relevant phase’s handover specifications or bring equipment and works records for second-hand or renovated units.
For Hang Hau estates, provide the actual building and entrance and explain occupancy. Check retained fittings at vacant possession; for renovation inspections, confirm completion and appropriate removal of protection.
For Tiu Keng Leng, give building, block and residential entrance and explain any podium or lift changes. Utilities and operable equipment must be available for testing on the inspection date.
For LOHAS Park, specify phase, formal development name and block. Handover specifications, included equipment and defect submission must be checked for the relevant phase, not borrowed from another development.
For Clear Water Bay homes, explain the full street number, internal storeys and entrance. Confirm roof, garden or external-area permissions, safety and scope for village houses or houses and give usable area.
Inspection and follow-up
Prepare the quotation, drawings, equipment models and agreed changes.
After receiving the electronic report without photos, organise findings by location and item number and request an itemised response from the developer, owner or contractor. Your own photos can support your follow-up records.
Confirm repair progress and site conditions before checking the same locations. For a separately booked reinspection, send the recheck list and agree scope, availability and the separate fee first.
Neighbourhoods
Some New Territories locations, such as Ma Wan, carry a remote-area fee. Give the full address when booking so the fee can be confirmed.
District directory
82 directory entries: 82 residential, 0 commercial. Search by Chinese or English name, address or district. For an unlisted unit, send the address directly.
Showing 82 of 82 entries
FAQ
Provide the complete building, phase/block, floor and unit, usable floor area and preferred date. Explain the handover or renovation stage, utilities and access permission.
Explain completed and ongoing work first so timing and scope can be agreed. Disconnected equipment, uncured work and covered finishes may not be testable. Arrange basic cleaning and utilities and distinguish unfinished work from workmanship issues.
Use report locations and item numbers to prepare a follow-up list and request an itemised response and repair schedule. Keep agreed scope changes and responses, then recheck the same locations after repair. A separately booked reinspection is chargeable.
The fee uses HK$4.5 per sq ft of usable floor area with area-tier minimum charges. Stairs cost HK$80 per floor; applicable location and optional water-jet test fees are separate. Send the full address to confirm the total quote.
The electronic report is normally issued on the next business day. It records issue locations and inspection results without photos. Owners follow up rectification with the developer or contractor; a separately booked reinspection is chargeable.