Jump to main content

Post-renovation inspection

Post-renovation inspection in Sham Shui Po District

Plan a post-renovation inspection in Sham Shui Po District: timing, preparation, accessible scope and limitations, with 118 residential and commercial directory entries in Sham Shui Po.

Post-renovation inspection

Post-renovation inspection in Sham Shui Po: focus

After works are complete, compare paint, tiling, joinery, doors, windows and fittings with the agreed quotation and scope. Record unfinished, disconnected or covered areas separately and recheck the same locations after rectification.

Before booking

  • Bring the renovation quotation, drawings and agreed changes
  • Arrange access after completion, basic cleaning and utility connection
  • List workmanship and equipment questions for the contractor

Inspection types

Four inspection types in Sham Shui Po

Scope

What we check and where the limits are

Interior inspection focus

  • Doors, windows, glass, seals, locks and hardware
  • Walls, ceilings, plaster, paint and flooring
  • Tiles, marble, cabinetry and false ceilings
  • Operable plumbing, electrical and communication fittings and included appliances
View all 15 inspection items

Access and operating conditions

Inspection covers visible, accessible areas inside the unit. Concealed finishes and disconnected or unauthorised equipment are noted as limitations; general unit inspection does not replace structural assessments or statutory certification.

The water-jet test requires permission and costs an additional HK$200. Confirm arrangements when booking.

Arrangements

Pricing, booking and report

Stairs cost an additional HK$80 per floor. Confirm any remote-area fee for the actual address when booking.

  • Pricing

    Residential and commercial units use HK$4.5 per sq ft of usable area, subject to area-tier minimum charges; stair and remote-area fees apply separately.

    Pricing
  • Booking

    Inspections run daily 09:00–18:00. Same-day slots may be possible depending on availability; the date is fixed only once the booking is confirmed.

    Process
  • Report

    An electronic report without photos is normally issued on the next business day.

    Report content and use

Local preparation

Before booking in Sham Shui Po

Sham Shui Po

For Sham Shui Po units, provide the full street number and lift/stair details. State actual use; a general inspection does not certify statutory approval of a use or alteration.

Cheung Sha Wan

For Cheung Sha Wan commercial units, list pantries, independent toilets and operable equipment. Confirm permission to test management-controlled equipment rather than assuming it is within tenant scope.

Lai Chi Kok

For Lai Chi Kok homes and commercial buildings, verify entrance, block and use. Bring contractor quotations and equipment details for renovation checks, separating workmanship from existing building facilities.

Mei Foo

For Mei Foo estates, state phase, block and street entrance rather than only the estate name. At handover, check retained fittings and key/card arrangements; estate works and common facilities are outside unit scope.

Inspection and follow-up

What to do after inspection

Organise delivery and work records

Prepare the quotation, drawings, equipment models and agreed changes.

Follow up by issue location

After receiving the electronic report without photos, organise findings by location and item number and request an itemised response from the developer, owner or contractor. Your own photos can support your follow-up records.

Recheck the repaired locations

Confirm repair progress and site conditions before checking the same locations. For a separately booked reinspection, send the recheck list and agree scope, availability and the separate fee first.

Neighbourhoods

Neighbourhoods in Sham Shui Po

Kowloon includes many walk-ups and commercial buildings. Confirm access hours, goods-lift use and visitor registration with management or the owner in advance.

District directory

Property and address directory for Sham Shui Po

118 directory entries: 112 residential, 6 commercial. Search by Chinese or English name, address or district. For an unlisted unit, send the address directly.

Showing 118 of 118 entries

Sham Shui Po118

FAQ

Booking questions

What should I provide for post-renovation inspection at Sham Shui Po?

Provide the complete building, phase/block, floor and unit, usable floor area and preferred date. Explain the handover or renovation stage, utilities and access permission.

Can inspection take place before the works are complete?

Explain completed and ongoing work first so timing and scope can be agreed. Disconnected equipment, uncured work and covered finishes may not be testable. Arrange basic cleaning and utilities and distinguish unfinished work from workmanship issues.

How should I use the report to request rectification?

Use report locations and item numbers to prepare a follow-up list and request an itemised response and repair schedule. Keep agreed scope changes and responses, then recheck the same locations after repair. A separately booked reinspection is chargeable.

How is the inspection fee calculated for Sham Shui Po?

The fee uses HK$4.5 per sq ft of usable floor area with area-tier minimum charges. Stairs cost HK$80 per floor; applicable location and optional water-jet test fees are separate. Send the full address to confirm the total quote.

When will I receive the report, and does it include photos?

The electronic report is normally issued on the next business day. It records issue locations and inspection results without photos. Owners follow up rectification with the developer or contractor; a separately booked reinspection is chargeable.